CheekyMonkeyWrench
04-16-2007, 11:52 PM
i'm renovating a 1/2 bath, and i had to pull up the subfloor due to improper installation, flex and a high joist.
i would like to cut the pvc toilet pipe so i can get a snug fit around the waste pipe (3" i believe) with the new flooring.
i suppose you should install a new closet flange after the finished floor is down.
do you just install a coupler at the cut and then a 3" piece of pvc and then the flange?
btw, i have access below in the basement, and the riser is fairly long.
i would like to cut the pvc toilet pipe so i can get a snug fit around the waste pipe (3" i believe) with the new flooring.
i suppose you should install a new closet flange after the finished floor is down.
do you just install a coupler at the cut and then a 3" piece of pvc and then the flange?
btw, i have access below in the basement, and the riser is fairly long.