    Here is a pic of the Backflow Preventers installed in a LARGE laboratory environment. I did the plans and got the approvals on the Backflows.

    Attached Files

  • #2
    Re: My first design being built!!

    Looks nice, but where was the maid service, a little dusty eh....
    Great Link for a Construction Owner/Tradesmen, and just say Garager sent you....

    http://www.contractorspub.com

    A good climbing rope will last you 3 to 5 years, a bad climbing rope will last you a life time !!!

    Comment


    • #3
      Re: My first design being built!!

      its all those damn tapers

      Comment


      • #4
        Re: My first design being built!!

        Here is a plan I am working on today
        Attached Files

        Comment


        • #5
          Re: My first design being built!!

          and another one that i got the approval for yesterday
          Attached Files

          Comment


          • #6
            Re: My first design being built!!

            Looks very nice. When we install anything that needs supports, the supports need to be painted to prevent rust. Just provides a finished look. What do think gives you more self worth? Being the plumber who installed the system of the engineer who designed it since you've been on both sides of the fence?
            Buy cheap, buy twice.

            Comment


            • #7
              Re: My first design being built!!

              looks nice

              why is there a valve in between the strainer and back flow ? if you have one before and after ?
              Charlie

              My seek the peek fundraiser page
              http://observatory.mountwashington.o...nal&fr_id=1040


              http://www.mountwashington.org/weather/conditions.php

              new work pictures 12/09
              http://public.fotki.com/hvachawk/

              Comment


              • #8
                Re: My first design being built!!

                Originally posted by gear junkie View Post
                Looks very nice. When we install anything that needs supports, the supports need to be painted to prevent rust. Just provides a finished look. What do think gives you more self worth? Being the plumber who installed the system of the engineer who designed it since you've been on both sides of the fence?
                I honestly think that to me I'd rather say i installed it.... I may change my mind though. Only time will tell.

                Comment


                • #9
                  Re: My first design being built!!

                  Originally posted by HVAC HAWK View Post
                  looks nice

                  why is there a valve in between the strainer and back flow ? if you have one before and after ?
                  The health department required it. They couldn't comprehend the system without it. I believe when i was speaking to him on the phone it "did not compute"

                  Comment


                  • #10
                    Re: My first design being built!!

                    If you are referring to the setup pictured below then the answer is fairly simple I think...
                    RPZs are certified as a whole unit only and cannot be re-arranged in any way without voiding the certification...
                    The unit generally consists of the two valves and the central body of the RPZ assembly...
                    In other words, as I understand it, if the valves are removed or relocated, the RPZ can no longer be considered useable...
                    Attached Files