  • PRV before the meter

    New requirement here as per city code, all PRV's must be installed before the water meter. That's going to raise the price of a PRV installed! Will have to move the water meter further down stream, among other things.

  • #2
    Re: PRV before the meter

    Originally posted by ironranger View Post
    New requirement here as per city code, all PRV's must be installed before the water meter. That's going to raise the price of a PRV installed! Will have to move the water meter further down stream, among other things.
    You cold climate guys can do that, We can't ! Your Meters are accesable in a basement. Here in most of Ca., ours is in a concrete meter box in the sidewalk. about 10" deep. no frost!
    I can build anything You want , if you draw a picture of it , on the back of a big enough check .

    Comment


    • #3
      Re: PRV before the meter

      Does that mean you have to contact them to arrange a shut down?

      Comment


      • #4
        Re: PRV before the meter

        Originally posted by Plumbus View Post
        Does that mean you have to contact them to arrange a shut down?
        Back in Boston It's all accesable in the basement. And after the house gate valve
        I can build anything You want , if you draw a picture of it , on the back of a big enough check .

        Comment


        • #5
          Re: PRV before the meter

          No, they're okay with us moving their meters and turning off their curb stops. Moving the meter pretty much doubles the amount of time to install a prv.


          Originally posted by Plumbus View Post
          Does that mean you have to contact them to arrange a shut down?

          Comment


          • #6
            Re: PRV before the meter

            hope you post a before N after picture
            I can build anything You want , if you draw a picture of it , on the back of a big enough check .

            Comment


            • #7
              Re: PRV before the meter

              I don't deal with PRVs In my district but me do have a back flow requirement. When we run a new service complete with a new 1" tap, we sell all of the material to the plumber. That includes the meter pit cover etc we use a Z Setter that is pre plumbed for the RPZ and the meter. Wonder if the make a setter like that with a PRV? Try calling Ford or Meuller?